.jpg%202026-09-16%20at%204.17.52%20PM.webp)
Our Completed Construction Projects
95 Years of Completed Builds Across the Southeast


ChristChurch Presbyterian Addition and Renovation

ChristChurch Presbyterian Addition and Renovation
Van Winkle’s work for ChristChurch Presbyterian on Atlanta’s Peachtree Road included the renovation of the original 1960s administrative building and the addition of a fresh, contemporary space for worship, education, and fellowship. The project’s functional and aesthetic urban character suits the church’s diverse Atlanta community.
- Size55,000 sf
- LocationAtlanta, Georgia
- MarketFaith-Based
- Architect
- ServicesPreconstruction · General Contracting · Value Engineering


St. Simons Community Church New Sanctuary and Education Building

St. Simons Community Church New Sanctuary and Education Building
This new sanctuary and education building for St. Simons Community Church includes a new sanctuary, classroom and youth spaces, and fellowship areas.
- Size80,000 sf
- MarketFaith-Based
- Architect
- ServicesPreconstruction · Construction Manager


Lake Oconee Community Bank

Lake Oconee Community Bank
Lake Oconee Community Bank is a new arts and crafts style building with high grade finishes. The building’s design complements the adjacent Lake Oconee resort community, including a Ritz Carlton Resort.
- Size6,700 sf
- LocationGreensboro, Georgia
- MarketCommercial
- ServicesPreconstruction · General Contracting


Prince Avenue Baptist Church Worship Center

Prince Avenue Baptist Church Worship Center
The Prince Avenue Baptist Church Sanctuary Addition expanded the campus with a new 1,800-seat worship space, lobby, office wing, restrooms, and associated support spaces, while also renovating and tying into the existing gathering hall to create a seamless transition between the existing and new facilities. The project utilized more than 2,700 cubic yards of concrete across foundations, slabs, casting beds, and architectural panels, including 1,515 cubic yards of concrete and 106 tons of reinforcing steel in the panels, which weighed approximately 6.3 million pounds. A distinctive feature of the project was the curved front elevation, where concrete wall panels were cast in radius forms to create the building's sweeping façade. The exterior was further enhanced with more than 17,000 square feet of thin brick cast directly into the wall panels, combining architectural detail with the durability of the precast concrete system.
- Size130,000 sf
- LocationBogart, Georgia
- MarketFaith-Based
- Architect
- ServicesPreconstruction · General Contracting · Construction Manager


Clark Atlanta University Thayer Hall

Clark Atlanta University Thayer Hall
Van Winkle Construction’s renovation and restoration of Clark Atlanta University ’s Thayer Hall improved it inside and out. This historic three-story building houses classrooms, laboratories, administrative offices, and a community outreach area for the college’s School of Social Work.
- Size22,000 sf renovation
- MarketSpecialty
- Architect
- ServicesPreconstruction · Construction Manager


Immaculate Heart of Mary Catholic Church New Sanctuary

Immaculate Heart of Mary Catholic Church New Sanctuary
Van Winkle constructed this new Construction Manager at Risk sanctuary building for Immaculate Heart of Mary Catholic Church on the campus’s existing site. The building contains a sanctuary with meeting space, restrooms, nursery, and childcare rooms.
- Size17,000 sf
- LocationAtlanta, Georgia
- MarketFaith-Based
- Architect
- ServicesPreconstruction · Construction Manager



.jpg%202026-09-17%20at%203.08.46%20PM.webp)
Let's Talk About Your Project
Tell us a little about what you're building, and we'll follow up to talk through next steps.
We do not accept unsolicited sales or vendor inquiries through this form.

